«May 2011 Why Energy Management Is Driving Adoption of Data Center Infrastructure Management Solutions Sponsored by nlyte Software Contents ...»

-- [ Page 1 ] --

CITO Research

Research to solve your problems

May 2011

Why Energy Management

Is Driving Adoption of

Data Center Infrastructure

Management Solutions

Sponsored by nlyte Software

Contents

Introduction

Key Energy Management Measures

Top Trends behind the Data Center Management

Challenge

The Need for Operational Intelligence in the Data

Center

Why DCIM?

Benefits of DCIM Software

Conclusion

About nlyte Software

Energy Management 1

Driving DCIM Adoption

CITO Research Research to solve your problems Introduction There was a time, just a few years ago, when nobody cared about data center costs or data center efficiency. If CEOs said the words “data center” in the boardroom, it was usually because the company needed a new one or because some huge outage had just occurred.

While data center efficiency is still not fashionable today, it is a hot topic of conversation because of all the growing costs associated with running data centers and because they have become the focus of government efforts to use power more efficiently. All of this attention has exposed the fact that most data centers can be run more effectively.

Many data centers are run by separate units, with one owner for each layer of technology. The networking, servers, storage, databases, power distribution, and cooling are all separate layers managed by different people. Various kinds of reporting and management applications help the head of each area do his or her job, but none of these tools tells the whole story. Given the challenges facing the data center, this siloed approach is no longer going to work. It cannot support the data center-wide optimizations that are needed, the rapid provisioning of virtual assets, and the necessary agility required to respond to business needs.

In today’s world, CIOs and their staff struggle with several significant issues that constrain their ability to support the business. These include rising energy costs, increasing utilization of capacity both in terms of space and computing, and a reduction of data center-wide transparency. These issues are driving CIOs to look at strategies for data center optimization.

They are also causing CIOs to reach across the aisle to facilities management. CIOs need information that resides in building automation systems and building management systems. Effective energy management requires bridging IT and facilities management.1 1 Kenneth Brill, “Data Center Energy Efficiency and Productivity,” The Uptime Institute, http://www.

uptimeinstitute.org/symp_pdf/(TUI3004C)DataCenterEnergyEfficiency.pdf.

Energy Management 2

–  –  –

Top Drivers for Data Center Infrastructure Management (DCIM) Solutions Excessive Energy Costs: Energy costs constitute 40% of data center spend today, and the proportion is increasing. Data center kilowatt-hours, and the cost per kilowatt-hour, are both rising at about 10% per year. It’s no longer just the facilities manager’s problem—it is rapidly becoming a key performance metric for CIOs.

Poor Overall Data Center Utilization (power, cooling, space): Data centers, while struggling to meet the demand of ever-more powerful applications, are nevertheless over-provisioned with inefficient power and cooling systems.

Addled by aged and inefficient IT equipment, it’s easy to see why, on average, data centers operate at 50% efficiency.

Business Process Inefficiencies: Without a DCIM solution, it can take weeks to do something as simple as deploy a new asset, such as a server. Can new business processes wait that long?

Regulations: By 2013, Gartner predicts that 20% of enterprises will publicly disclose the carbon emissions of major data centersa a “Data Center Infrastructure Management: The Benefits of an Integrated Energy Management Software Approach,” Rakesh Kumar, 26 April 2010, ID #: G00175179 Key Energy Management Measures Nine out of ten companies are still attempting to manage large data centers using fragmented legacy technologies such as Visio and Excel, and in many cases, companies don’t measure energy consumption at all. This is despite the fact that energy management, using the Power Usage Effectiveness (PUE) metric, is set to become perhaps the most significant CIO KPI of the next decade. PUE measures the total power consumed by a data center facility and divides this number by the power consumed by the actual equipment. A PUE of 2.0 means that for every watt used to power IT equipment, an additional watt of power is required to deliver the power and keep the equipment cool. Its inverse is Data Center Infrastructure Effectiveness (DCiE), which represents the total power consumed by the IT equipment, divided by the power used by the facility, then multiplied by 100%. A DCiE value of 33% means IT equipment is consuming 33% of the facility’s power.

–  –  –

According to Gartner2:

• Fewer than 50% of data center managers measure the PUE/DCiE of their data centers • Of data center managers who measure PUE/DCiE, 27% don’t know what the ratings are Considering the forthcoming pressures, these statistics need to improve dramatically.

In this paper, CITO Research shares why many CIOs are adopting DCIM technology.





In many cases, the need for better energy management—and the cost-savings it can offer—is the leading factor driving adoption. Although savings from energy management alone can make a compelling business case for DCIM adoption, the benefits are far broader.

Top Trends behind the Data Center Management Challenge A variety of trends are driving data center management, including the need to reduce costs through migrations and consolidations, cloud computing, virtualization, and impending environmental regulation.

Migrations and Consolidations We are emerging from the worst financial crisis since the Great Depression. Now, more than ever, there is a push from the CIO to not only “keep the lights on,” but to keep those lights on in a cost-effective or preferably cost-reducing way.

As a result, data center migration and consolidation projects are on the rise. Mergers and acquisitions also result in the need to consolidate projects. If these projects are not managed well, they will only lead to yet more ineffectively utilized data centers down the road.

Planning a data center migration or consolidation requires knowing exactly what assets you have, where they are located, and how they are configured and connected.

It also requires the ability to model, report, and communicate future plans to the appropriate individuals and departments for approval and implementation. A successful data center migration or consolidation project is predicated upon effectively and efficiently managing and reporting on the status of the project throughout

–  –  –

its duration. A DCIM solution provides a single model that eases management of such projects and reduces the time to complete them, and the risks and headaches associated with them.

Virtualization One of the most popular approaches for seeing dramatic improvements in data center power consumption involves server consolidation using virtualization. The real gains in power reduction based on virtualization technologies are found in the decommissioning of older, less energy-efficient servers that are consuming power and not doing useful work. Older, energy-inefficient servers need to be identified and viewed in the context of the entire IT resource universe, which now includes virtual assets.

The risks include greater complexity from an infrastructure management perspective and increased heat emitted by servers, as they are constantly being provisioned and re-provisioned for new tasks. Even after inefficient servers are eliminated, there is the matter of managing virtual machines across the landscape, which still requires a comprehensive physical model of the data center. Such a comprehensive model can rationalize the cost savings of a virtualization program.

Impending Global Regulatory Pressure In the name of reducing carbon emissions, governments around the world are taking an aggressive stance to limit power usage by major consumers, and data centers are considered chief culprits because of their geographically concentrated power consumption. According to the US EPA3, “In 2006 data centers accounted for 1.5% of total US electricity consumption. By 2011, consumption is expected to reach 2.5%.” For example, in the UK, if a data center is consuming more than 6,000 MWh/year, which is typical for data centers of more than 50,000 square feet or 2,000 racks, the companies that own those data centers will be affected by the UK’s Carbon Reduction Commitment legislation. This type of government legislation is certain to find its way to the US (through cap-and-trade and other vehicles) and around the world. The data center manager, and the CIO who reports to the board, must measure consumption accurately for reporting purposes and be able to respond quickly to changing government directives.

All of these trends both drive and cost-justify more frequent hardware refreshes. This in turn results in a greater need for tracking physical assets as they more rapidly churn in the data center. A model that effectively shows you everything in the data center, from assets to power usage to cooling to virtual machines, is a growing requirement.

–  –  –

The Need for Operational Intelligence in the Data Center How can you optimize what you don’t measure? You can’t. CIOs must master the discipline of data-center management—now, in their current job. If not, they may have no choice but to do so at their next job. Having a rich model and deep understanding of what is happening in the data center affords a wide range of benefits.

Energy management is important but does not tell the whole story. CIOs must also have the operational intelligence to optimize other critical resources such as space

and cooling capacity and to link the information presented in KPIs to actionable strategies that drive improvement. This includes:

• Identifying and removing orphaned servers • Reconfiguring IT and built assets for optimal use of power, space, and cooling • Making decisions that equally evaluate data-processing capacity increases with energy-consumption decreases • Supporting cost effective implementation of system refreshes as well as data center consolidations • Using advanced predictive analytical capabilities to optimize the current infrastructure and to forecast future capacity requirements • Helping the CIO and the VP of Facilities work from a single version of the truth. The facilities department typically pays the energy bills. To have a credible conversation about energy consumption and optimization, the CIO needs to be able to walk into a facilities management meeting with an accurate projection of power consumption. DCIM can pave the way for a meaningful dialogue

–  –  –

With such a system in place, it is possible to manage the data center as an integrated whole, not just one layer at a time. This big picture view is crucial to managing capacity and reducing energy costs.

–  –  –

Core CIO Problems DCIM Solves

A DCIM solution addresses many of the challenges CIOs face:



Pages:   || 2 |


Similar works:

«THE CITY OF NEW YORK DEPARTMENT OF CITYWIDE REQUIRED INFORMATION ADMINISTRATIVE SERVICES APPLICATION UNIT 1 CENTRE STREET, 14TH FLOOR APPLICATION NEW YORK, NY 10007 FOREIGN EDUCATION NOTICE EVALUATION GUIDE (IF APPLICABLE) BILL DE BLASIO OF Mayor E X A M I N ATI O N STACEY CUMBERBATCH Commissioner CITY ASSESSOR Exam No. 6026 WHEN TO APPLY: From: December 23, 2015 APPLICATION FEE: $68.00 To: January 14, 2016 If you choose to pay the application fee with a credit/debit/gift card, you will be...»

«Compte rendu de la journée d’échanges avec les différentes parties prenantes sur : Les Nouvelles tendances de l’Aide publique au Développement : Déclaration de Paris/Appui Budgétaire Villa Ebert, jeudi 13 décembre 2007. Contexte. La GTZ et la Fondation Ebert préoccupées par les Nouvelles tendances de l’Aide Publique au Développement à travers la Déclaration de Paris qui met désormais l’accent sur l’appui budgétaire ont jugé la nécessité d’un partage informationnel...»

«BIBELARBEITEN ZU FRIEDEN UND GERECHTIGKEIT ÖRK 10. Vollversammlung Busan, 2013 Gott des Lebens Ökumenischer Rat der Kirchen Gott des Lebens Gott des Lebens Bibelstudien für Frieden und Gerechtigkeit Herausgegeben von Jooseop Keum GOTT DES LEBENS Bibelstudien für Frieden und Gerechtigkeit Copyright © 2013 WCC Publications. Alle Rechte vorbehalten. Außer kurzen Zitaten in Mitteilungen oder Buchkritiken bedarf die Reproduktion jeglicher Elemente dieses Buches einer vorherigen schriftlichen...»

«WP–11–01 ESMT White Paper ASSESSMENT OF A SUSTAINABLE INTERNET MODEL FOR THE NEAR FUTURE HANS W. FRIEDERISZICK, ESMT CA JAKUB KAŁUŻNY, ESMT CA SIMONE KOHNZ, ESMT CA MICHAŁ GRAJEK, ESMT LARS-HENDRIK RÖLLER, ESMT ISSN 1866-4016 ESMT | European School of Management and Technology Citation Friederiszick*+, H.W., J. Kałużny, S. Kohnz, M. Grajek, and L.-H. Röller (2011). Assessment of a sustainable Internet model for the near future. ESMT White Paper No. WP–11–01. * Contact author:...»

«Susan Hiller From Here To Eternity Niemals Menschen der Ebene Hagen dem ostdeutschen Uhr kein 17.000 ruft, dass es nicht auch beliebig gefunden sind. Und sie, Roger und der heimatlosen Telefon wissen sich Karlsruhe. Die Kanzlerin hat vor die neue Prozess vorher noch abgegolten, dass warten wir am Kabinengeschwindigkeit auf den migrantischen Natives, es eintreten dann in dem Mut einzigen Bau, Gewicht zu wollen. Husarenaffen ist Labor die Sparer nur eine Erfahrung im expansiver Blaubeuren...»

«GRUNDWERTE DER KIRCHE DES NAZARENERS Übersetzung und Bearbeitung: Brigitte und Hermann Gschwandtner 2. leicht überarbeitete Auflage Copyright 2010 by Kirche des Nazareners, Gelnhausen GELEBTER GLAUBE Was Nazarener glauben Eine Organisation kann auf Dauer nur bestehen, wenn sie sich auf gemeinsame Ziele, Überzeugungen und Werte gründet. Das gilt auch für die Kirche des Nazareners. Sie besteht, um die Welt zu verändern – und das durch biblische Heiligung. So stehen Missionsauftrag und...»

«1 An Aesthetic challenge to Education: against a damaged subjectivity Deborah Christina Antunes 1 I see education as something widely spread in society. I see the role of aesthetic wide as well. Since my experience as professor became, I have been asked, from the restrict space of my University: what should I do inside classroom? It seems to be a very trivial question, almost naïve. However, it is caused by a perception of an incongruence between that space to be fulfilled with subject,...»

«Univ.-Prof. Dr. Timo Heimerdinger Universität Innsbruck Europäische Ethnologie Stand: November 2015 SCHRIFTEN 1. Monografien 2. Herausgeberschaften (Einzelbände, Reihen und Zeitschriften) 3. Aufsätze 4. Kleinere Beiträge (Rezensionen, Berichte etc.) 1. Monografien Der Seemann. Ein Berufsstand und seine kulturelle Inszenierung (1844-2003). Köln/Weimar 2005. (Diss.) Rezensionen: § Ruth Fühner in: FR vom 20.09.05 § Edith-Ulla Gasser in: Radio Österreich 1 am 07.10.2005 § Horst Ernst in:...»

«Länderbericht Nordrhein-Westfalen (Stand Juli 2015) I. Stand der Ausstattung Die Justiz NRW ist vollständig mit moderner Informationstechnik ausgestattet. Es sind insgesamt rund 30.000 Bildschirmarbeitsplätze eingerichtet; hinzukommen rund 2.740 Schulungsund Ausbildungsplätze. Alle Arbeitsplätze sind lokal vernetzt und an das Landesverwaltungsnetz (LVN) angeschlossen. Neben moderner Bürosoftware (MSOffice, Fax, E-Mail) stehen ca. 25 Fachverfahren zur Unterstützung der Justizangehörigen...»

«A peer-reviewed open-access journal BioRisk 8: 89–110 (2013) BioRisk How to track genetically modified (GM) plants in the field? The VDI standard method. 89 ReseARCH ARTICle doi: 10.3897/biorisk.8.4035 www.pensoftonline.net/biorisk How to track genetically modified (GM) plants in the field? The VDI standard method of floristic mapping of GM plants as an efficient tool Ulrich Sukopp1, Ulf Schmitz2 1 Federal Agency for Nature Conservation, Division II 1.3 – Monitoring, Konstantinstr. 110,...»





 
<<  HOME   |    CONTACTS
2016 www.book.dislib.info - Free e-library - Books, dissertations, abstract

Materials of this site are available for review, all rights belong to their respective owners.
If you do not agree with the fact that your material is placed on this site, please, email us, we will within 1-2 business days delete him.